"Can you build a radar to our spec?" — yes, and this page explains exactly how. We develop the antenna, RF front end, signal processing and firmware in-house, so range, beam pattern, interface, output format and housing can all be tailored. What follows is the actual process and, importantly, how we define "done".
The seven-step customisation flow
| Step | What happens | Your input | Our deliverable | Typical time |
|---|---|---|---|---|
| 1. Requirement review | Engineers assess feasibility of range, FOV, target types, environment and interface | Application brief, mounting space, target RCS | Feasibility note + band recommendation | 1–3 days |
| 2. Quotation & NRE scope | We define engineering scope, sample cost and volume pricing | Estimated volume, target price | Quotation + NRE breakdown + timeline | 2–5 days |
| 3. Design & simulation | Antenna and RF design, link-budget simulation, firmware architecture | Approved spec | Design review deck | 1–3 weeks |
| 4. Prototype build | PCB, antenna and enclosure prototype assembled in our SMT line | PO for samples | 2–5 working prototypes | 2–4 weeks |
| 5. Bench & field validation | Range, accuracy, FOV and environmental testing against the agreed criteria | Test site access if needed | Validation report + raw target logs | 1–2 weeks |
| 6. Acceptance | You verify the prototype against the written acceptance criteria below | Sign-off or change requests | Accepted sample + frozen spec | 3–7 days |
| 7. Mass production | Volume SMT, calibration, RF test and packaging | Production PO | Production units + CoC | 15–30 days |
Written acceptance criteria
Ambiguous specs cause disputes. Before prototype build we agree measurable criteria for every parameter that matters:
| Parameter | How it is measured | Example acceptance value |
|---|---|---|
| Detection range | Standard RCS corner reflector, stated weather, 95% detection probability | 0.2–120 m at RCS 1 m² |
| Range accuracy | 100 measurements at fixed distances, report mean error and standard deviation | ±3 cm (UAV77-O class) |
| Field of view | Azimuth and elevation angles where detection probability ≥90% | 120° × 60° |
| Update rate | Target list frames per second over the full interface | ≥20 Hz |
| Multi-target capacity | Simultaneous tracked targets with ID stability | up to 64 |
| Interface & protocol | Frame format document, CAN ID map, sample parsing code | CAN 500 kbit/s, defined frame |
| Power consumption | Measured at nominal supply, typical and peak | <1.5 W typical |
| Environment | Operating temperature, humidity, ingress protection | -40 to +85 °C, IP67 / IP69K |
| EMC & regulatory | Pre-compliance scan; CE / RoHS where applicable | Report supplied |
We supply the raw target logs so you can reproduce the measurements. If a criterion cannot be met, we say so at the design-review stage — not after you have paid for tooling.
What we need from you to start
- Application and environment (indoor/outdoor, weather, dust, vibration).
- Target description: typical size, material, RCS if known.
- Mounting space and mechanical constraints.
- Required range, FOV, accuracy and update rate.
- Interface and supply voltage on your platform.
- Estimated annual volume and target price band.
Send these to launston@launstontech.com or use the contact form. For standard products with minor changes, the process is usually shorter — see our 12-model product line and OEM guide.
Frequently asked questions
What is the typical total lead time for a custom radar?
From approved spec to accepted prototype is typically 4–8 weeks; mass production adds 15–30 days. Simple changes to an existing platform are faster.
Is NRE charged separately?
Yes, NRE is quoted separately and is often credited against volume orders. It is disclosed up front with no hidden engineering fees.
Can you customise the enclosure and branding?
Yes — housing, connector, label and packaging can be customised for OEM programmes.
What if the radar fails acceptance testing?
We review the raw data and retune firmware or antenna where feasible. If a requirement is physically unachievable, we tell you at design review before tooling.